1/8 (Tuesday)

-Began to cut pvc into correct lengths
-cut list is near the pvc in the shop
-drawings are there as well
-nxt time (1/9), we should finish cutting the pvc and start assembling!
« Last Edit: December 02, 2008, 08:33:34 AM by Kims Robot »
Logged
~~Theo~~
Northeastern University Class of 2015
Former Driver & Team Captain
FLL Veteran
Resident Assistant
Ultimate Frisbee Enthusiast

AmyG

  • Team Member
  • New Member
  • ***
  • Posts: 11
    • Email
Re: Field Engineering Notebook
« Reply #1 on: January 09, 2008, 12:22:35 PM »

1/8/08 - Team Members:  Karen, Sean, Theo   Edit: Amy G & Jason - mentors count too!
« Last Edit: January 09, 2008, 03:27:53 PM by Kims Robot »
Logged

Theo Matt

  • Team Member
  • Hero Member
  • ***
  • Posts: 674
  • Still gets a lot of emails...
    • Email
Re: Field Engineering Notebook
« Reply #2 on: January 09, 2008, 09:27:34 PM »

1/9/08

Members Present: Crystal, Theo (lol im not really even on this subteam)
Mentors: Amy (well she was at mech the whole time)

task complete: pvc cuts finished, assembled 1 side and part of the other side of the overpass without glueing.

tasks for next time: assemble rest of overpass, begin glueing select pieces together
Logged
~~Theo~~
Northeastern University Class of 2015
Former Driver & Team Captain
FLL Veteran
Resident Assistant
Ultimate Frisbee Enthusiast

Theo Matt

  • Team Member
  • Hero Member
  • ***
  • Posts: 674
  • Still gets a lot of emails...
    • Email
Re: Field Engineering Notebook
« Reply #3 on: January 11, 2008, 12:37:57 PM »

1/10/08

Members Present: Crystal, Sean, Karen, Theo
Mentors Present: Annie

Tasks Complete: Began gluing overpass together, but stopped due to health risks associated with fumes from the primer and cement.

Solution: My dad found a non-toxic "Gorilla PVC Glue" online last night and he is going to pick some up today so that we don't have to worry about the fumes.

Therefore; Tasks For Saturday: Glue overpass, start assembling center wall/supports.
Logged
~~Theo~~
Northeastern University Class of 2015
Former Driver & Team Captain
FLL Veteran
Resident Assistant
Ultimate Frisbee Enthusiast

Theo Matt

  • Team Member
  • Hero Member
  • ***
  • Posts: 674
  • Still gets a lot of emails...
    • Email
Re: Field Engineering Notebook
« Reply #4 on: January 12, 2008, 10:34:44 PM »

1/12/08

Start Time: 10:30am
Stop Time: 9:30pm

Members Present: Crystal, Theo

Tasks Accomplished: Both sides of overpass glued, divider wall assembled, aluminum pipe bought to reinforce pvc supports & overpass

Tasks to Complete: Cut Aluminum to size, glue divider wall together
Logged
~~Theo~~
Northeastern University Class of 2015
Former Driver & Team Captain
FLL Veteran
Resident Assistant
Ultimate Frisbee Enthusiast

Theo Matt

  • Team Member
  • Hero Member
  • ***
  • Posts: 674
  • Still gets a lot of emails...
    • Email
Re: Field Engineering Notebook
« Reply #5 on: January 15, 2008, 04:06:21 PM »

1/13/08

Start Time: 12:00
Stop Time: 7:00

Members Present: Theo, Crystal

Tasks Accomplished: Glued Divider Wall (both sides), cut aluminum to size, assembled field with both sides of overpass- stands by its self

Tasks to do: Build braces for overpass to eliminate sagging, glue sections of vertical supports for overpass
Logged
~~Theo~~
Northeastern University Class of 2015
Former Driver & Team Captain
FLL Veteran
Resident Assistant
Ultimate Frisbee Enthusiast

Theo Matt

  • Team Member
  • Hero Member
  • ***
  • Posts: 674
  • Still gets a lot of emails...
    • Email
Re: Field Engineering Notebook
« Reply #6 on: January 19, 2008, 10:22:12 PM »

1/19/08

Theo & Amy G

-Assembled Overpass with divider wall, made base footings for overpass supports

To do: Buy (2) 10-ft 1-in Aluminum Conduit rods, Buy 4 (8 would be nice, but not necessary) more cotter pin sets, glue vertical supports 
« Last Edit: January 22, 2008, 11:23:54 PM by themo22 »
Logged
~~Theo~~
Northeastern University Class of 2015
Former Driver & Team Captain
FLL Veteran
Resident Assistant
Ultimate Frisbee Enthusiast

Theo Matt

  • Team Member
  • Hero Member
  • ***
  • Posts: 674
  • Still gets a lot of emails...
    • Email
Re: Field Engineering Notebook
« Reply #7 on: January 25, 2008, 02:01:25 PM »

1/24/08

Theo, Crystal

Crate design started & almost finished in inventor, one wall to floor mount made

To do: Buy (2) 10-ft 1-in Aluminum Conduit rods, Buy 4 (8 would be nice, but not necessary) more cotter pin sets, glue vertical supports, finish crate design, design cart, build everything. Get sleep.
Logged
~~Theo~~
Northeastern University Class of 2015
Former Driver & Team Captain
FLL Veteran
Resident Assistant
Ultimate Frisbee Enthusiast

Theo Matt

  • Team Member
  • Hero Member
  • ***
  • Posts: 674
  • Still gets a lot of emails...
    • Email
Re: Field Engineering Notebook
« Reply #8 on: February 15, 2008, 08:50:12 AM »

Ok so heres what we still need to do this weekend:

-Assemble Overpass in Gym with proper braces and secure to field rails
-Assemble filed rails and attach with 2x4s (2 per joint)
-Cut plywood to line bottom of divider wall and field rails near overpass
-Assemble end walls and make 45 degree corner cuts into field, line with camo playwood
-Finish Crate: attach extra shelves to bottom, door closing 2x4s, other? test for strength, WEIGH!
-Cart Work: if time

Criteria for cart: Lightweight, fits in crate, fits through doorway, easy to manuver  \